Skip to main content
Aerial 3D Mapping

Drone Photogrammetry

Transform aerial imagery into precise 3D terrain models, orthomosaic maps, and volumetric data. Our FAA Part 107 certified pilots operate enterprise DJI M350 RTK drones delivering survey-grade accuracy for construction, land development, and site documentation. Track construction progress, calculate cut/fill volumes, and create GIS-ready deliverables.

See It In Action

Watch our drone photogrammetry technology at work.

Construction Site Mapping

Construction Site Mapping

Aerial photogrammetry for construction progress monitoring

Volume Calculation

Volume Calculation

Accurate stockpile and cut/fill volume measurements

Construction Timeline

Construction Timeline

Track project progress over time with aerial documentation

Facade Documentation

Facade Documentation

High-resolution building facade mapping

Key Features

Industry-leading capabilities that set our drone photogrammetry services apart.

RTK Positioning

Centimeter-level accuracy with real-time kinematic GPS and mechanical shutter cameras (M4E, P1) for distortion-free imagery.

Orthomosaic Maps

True-scale aerial imagery stitched into seamless base maps.

3D Terrain Models

Digital Surface Models (DSM) and Digital Terrain Models (DTM).

Volume Calculations

Accurate cut/fill and stockpile volume measurements.

Progress Monitoring

Regular flyovers to track construction progress over time.

GIS Integration

Deliverables in GeoTIFF, DXF, and standard GIS formats.

Our Process

A streamlined workflow designed to deliver exceptional results.

01

Flight Planning

Define area, accuracy requirements, and deliverables.

02

Ground Control

Set survey-grade ground control points if required.

03

Flight & Capture

FAA-certified pilots execute the flight mission.

04

Processing

Photogrammetric processing and deliverable generation.

What You'll Receive

  • Orthomosaic (GeoTIFF)
  • Digital Surface Model
  • Digital Terrain Model
  • Contour Lines
  • 3D Mesh
  • Volume Report

Key Benefits

  • Survey large areas quickly
  • Safer than manual surveying
  • Accurate volumetric data
  • Track construction progress
  • Create base maps for design
  • Document site conditions

RTK-corrected drone photogrammetry achieves 2-3 cm accuracy across hundreds of acres in a single day. That kind of coverage and precision was impossible five years ago without a full field crew and weeks of work.

THE FUTURE 3D Team — Aerial Survey Operations

Drone Photogrammetry vs Traditional Survey

Drone Photogrammetry vs Traditional Survey
FactorDrone PhotogrammetryTraditional Ground Survey
Accuracy2–5 cm with GCPs/RTK1–2 cm with total station
Speed (10 acres)2–4 hours2–3 days
Cost (10 acres)$1,500–$3,000$5,000–$15,000
DeliverablesOrthomosaic, DSM, DTM, 3D meshTopo map, boundary plat
VegetationCannot penetrate canopyManual clearing required

Industries We Serve

Our drone photogrammetry services support professionals across these industries.

Frequently Asked Questions

What accuracy do you achieve?

With RTK and ground control, we achieve 1-2cm horizontal and 2-3cm vertical accuracy.

How large an area can you map?

We regularly map sites from 1 acre to 1,000+ acres in a single day.

Do you need ground control points?

For survey-grade accuracy, yes. For general mapping, our RTK drones provide sufficient accuracy.

Pricing shown reflects average US rates. Actual costs vary by location based on local market conditions, regulations, and project logistics — both within the US and internationally. Get a custom quote

Gaussian Splatting

Add Photorealistic 3D Visualization

Transform the same aerial drone data into photorealistic Gaussian Splatting scenes that render at 100+ FPS. GS processing adds real-time visualization alongside your standard photogrammetry deliverables.

Learn More

Explore guides and answers related to drone photogrammetry.

Nationwide Coverage

Drone Photogrammetry Available Nationwide

Our drone photogrammetry services are available across all 50 states and select international locations. Select your city for local pricing and availability.

See All Drone Photogrammetry Service Areas

Explore 400+ locations across the United States & internationally

Ready to Get Started?

Request a custom quote for your drone photogrammetry project. We typically respond within 1 hour to discuss your project needs.

Licensed & Insured
Avg 1hr Response